Brine Line Reach V Maintenance Access Structure

Value: $124,400.00 Contractor: Caliagua Inc. Designer: CDM Inc. Completed: September 2008

Install a new maintenance point providing access to the interior of the pipeline to conduct activities such as closed circuit television inspection of the pipe and pipeline cleaning.